<

ALTECH ADVANCED MATERIALS AG EQS-Adhoc: Altech Advanced Materials AG: publishes results of final feasibility study for CERENERGY battery plant

Transparency directive : regulatory news

20/03/2024 10:28

EQS-Ad-hoc: Altech Advanced Materials AG / Key word(s): Study/Study results
Altech Advanced Materials AG: publishes results of final feasibility study for CERENERGY battery plant

20-March-2024 / 10:28 CET/CEST
Disclosure of an inside information acc. to Article 17 MAR of the Regulation (EU) No 596/2014, transmitted by EQS News - a service of EQS Group AG.
The issuer is solely responsible for the content of this announcement.


Publication of inside information pursuant to Article 17 MAR

 

Altech Advanced Materials AG publishes results of final feasibility study for CERENERGY battery plant

Heidelberg, 20.03.2024 - Altech Advanced Materials AG (ISIN: DE000A31C3Y4, DE000A31C3Z1 und DE000A3EX2C1) announces the results of the final feasibility study (DFS) for the planned CERENERGY battery plant of Altech Batteries GmbH in Schwarze Pumpe with a planned annual production capacity of 120 MWh. Based on current price and cost calculations, this results in a sales potential of EUR 106 million per year at full capacity utilization. Free cash flow before tax is EUR 51 million per year. The EBITDA margin is 47%. The net present value (NPV) amounts to EUR 169 million. The internal rate of return is 19% and the capital repayment period is 3.7 years with continuous operation. The investment costs for the battery plant are estimated to amount to EUR 156 million.

In view of the expected economic viability of the CERENERGY project, the project partners Altech Advanced Materials AG, Altech Batteries Ltd and the joint venture partner, Fraunhofer Gesellschaft zur Förderung der angewandten Forschung e.V., now intend to enter the financing phase of the project in order to enable it to be realized as soon as possible.

Explanatory part

A first production plant for CERENERGY in Schwarze Pumpe, Saxony, for a first line with an annual capacity of 120MWh, is currently being planned. Corresponding building applications have been submitted, land acquired, and the production plant design drawn up. Altech has also submitted funding applications at federal and state level to finance the battery plant.

According to the calculations, the total operating costs of the CERENERGY sodium chloride solid-state battery amount to EUR 0.06/kWh over the entire service life and are therefore significantly lower than those of conventional lithium-ion batteries at EUR 0.13-0.16/kWh. Unlike lithium-ion batteries, CERENERGY batteries do not require external cooling or heating units and are also non-flammable. CERENERGY batteries for stationary operation consist of common salt, nickel and ceramics and do not require critical materials such as graphite, lithium and cobalt, which fluctuate greatly in price. All materials can be sourced from Europe, minimizing dependencies in the supply chain. It is expected that the production costs of CERENERGY batteries can be further reduced through scaling when the capacity at the planned production plant in Schwarze Pumpe increases to one GWh production in the next expansion stage. Analysts expect strong growth of 28% per year on average for the global grid storage market until 2040.

A summary of the feasibility study can be downloaded from the Altech Advanced Materials AG website www.altechadvancedmaterials.com in the "Project information" section.

 

About Altech Advanced Materials AG

Altech Advanced Materials AG (ISIN: DE000A31C3Y4, DE000A31C3Z1 und DE000A3EX2C1), based in Frankfurt am Main, is a holding company listed on the regulated market of the Frankfurt Stock Exchange. The company's aim is to participate in the solid-state battery market for stationary battery applications with CERENERGY.

Another focus is on lithium-ion batteries. An innovative anode material based on high-purity aluminum oxide (HPA) - Silumina Anodes™ - is intended to significantly increase the performance of this battery for electromobility.

CERENERGY® battery project

Altech Batteries GmbH (ABG) is a joint venture with the world-leading German battery institute Fraunhofer IKTS ("Fraunhofer") to commercialize the revolutionary CERENERGY sodium-alumina solid-state battery (SAS).  CERENERGY batteries are the breakthrough alternative to lithium-ion batteries. CERENERGY batteries are fire and explosion proof, have a lifespan of more than 15 years and operate in extremely cold and desert climates.  The battery technology uses common salt and is free of lithium, cobalt, graphite and copper, eliminating dependence on critical metal price increases and supply chain issues.

The joint venture markets its CERENERGY battery and plans to build a 120 MWh production plant on the Altech site in Saxony. The plant will produce CERENERGY battery modules for the grid storage solutions market.

 

Altech Advanced Materials AG
Management Board: Iggy Tan, Uwe Ahrens, Hansjörg Plaggemars
Ziegelhäuser Landstrasse 3
69120 Heidelberg
info@altechadvancedmaterials.com
Tel: + 49 6221 649 2482
 
 
Press contact
Ralf Droz / Doron Kaufmann, edicto GmbH
Tel: +49 (0) 69 905505-54
E-Mail: AltechAdvancedMaterials@edicto.de

 



End of Inside Information

20-March-2024 CET/CEST The EQS Distribution Services include Regulatory Announcements, Financial/Corporate News and Press Releases.
Archive at www.eqs-news.com


Language: English
Company: Altech Advanced Materials AG
Ziegelhäuser Landstraße 3
69120 Heidelberg
Germany
Phone: +49 (0)6221 6492482
E-mail: info@altechadvancedmaterials.com
Internet: www.altechadvancedmaterials.com
ISIN: DE000A31C3Y4, DE000A31C3Z1, DE000A3EX2C1
WKN: A31C3Y, A31C3Z, A3EX2C
Listed: Regulated Market in Frankfurt (General Standard); Regulated Unofficial Market in Berlin, Dusseldorf, Munich
EQS News ID: 1862617

 
End of Announcement EQS News Service

1862617  20-March-2024 CET/CEST

fncls.ssp?fn=show_t_gif&application_id=1862617&application_name=news&site_id=symex~~~af100301-a623-4c64-8f3d-90fc88eca9e6

source : webdisclosure.com



Other stories

21/12/2024 11:16
21/12/2024 11:18
20/12/2024 19:34
21/12/2024 10:26
20/12/2024 15:51
20/12/2024 18:14
21/12/2024 06:58
21/12/2024 10:24
21/12/2024 10:53
21/12/2024 02:43
20/12/2024 17:47
21/12/2024 12:35
21/12/2024 06:27
21/12/2024 11:39
21/12/2024 09:14
21/12/2024 06:05
21/12/2024 03:03
20/12/2024 19:39
20/12/2024 13:30
20/12/2024 14:03
21/12/2024 12:31
21/12/2024 09:57
21/12/2024 08:30
21/12/2024 06:18
20/12/2024 19:59
20/12/2024 10:00
21/12/2024 10:50
21/12/2024 12:24
21/12/2024 09:37
20/12/2024 15:22
21/12/2024 10:18
19/12/2024 16:12
20/12/2024 18:55
20/12/2024 11:49
21/12/2024 11:00
20/12/2024 14:19
20/12/2024 21:45
20/12/2024 13:26